Chinook Cove Water System Upgrades Phase 2 – Kenkeknem Reservoir
The scope for this project is to complete a new 615m3 cast-in-place concrete reservoir adjacent to an existing reservoir. Works will include all new overflow, drain, inlet and distribution piping that will be required to be tied into the existing system.