Creston Wastewater Treatment Plant Solids Dewatering Facility Upgrade
Carver constructed a 3,400 sq.m. earthen pad to increase dewatering site elevation complete with a 2,180 sq.m. concrete slab for the Geotubes being installed. A steel frame structure covers the concrete pad. A package filtrate lift station complete with pumps, appurtenances and electrical controls was also supplied and installed as part of Carver’s scope along with all required underground utilities for the sludge feed, the filtrate collection and forcemain lines. Carver relocated the existing dewatering polymer equipment and supplied all new process piping, electrical feeder and communication systems for the new polymer building.