Dunmore / Irvine / Walsh Regional Water Supply – Contract 3
Work on this project commenced in September 2014, the scope of work included the construction of a new cast-in-place concrete reservoir with wood frame and masonry block pump-house incorporating the chemical feed system, transfer pumping systems and all associated mechanical and electrical work required for water distribution throughout the County. At a separate location modifications were undertaken to an existing building which included new header piping installation, a new chemical feed system along with some electrical and instrumentation upgrades. Several tie-in’s to the existing regional pipeline were completed at both locations.