Stevenson Sanitary Pump Station Replacement & Utility Improvements
Carver will mobilize to site in July 2024 to begin construction of the new Stevenson Pump Station for the City of Surrey. We have been contracted to replace the existing wet well with a new FRP pump station complete with mechanical and electrical installations as well as supply & install a new precast concrete underground valve chamber and install over 170 lm of 200mmØ sanitary gravity main. Once the new equipment is commissioned, we will demolish the existing old infrastructure.
This project also consists of the installation of a 60m of 200mmØ DI TR-Extreme fire water service connection and 50mmØ of domestic water service connection complete with a combined domestic water meter & fire backflow preventer chamber at an entirely separate location than the lift station